117th St/120th St

117th St Potential NDS Improvements

30% Design Plan - Adjustments may be made as design is finalized

SPU and SDOT are balancing on-street parking and pedestrian safety priorities while designing the 117th and 120th sites.

Street Right Of Way Utilization Key

117th_replace_1.PNG

Meridian Ave N to Corliss Ave N

117th_replace_3.PNG

Corliss Ave N to 1st Ave NE

117th_replace_4.PNG
117th_replace_5.PNG

To provide a comfortable and accessible walking connection to Northgate Elementary School, Seattle Department of Transportation (SDOT) is planning to construct a new asphalt sidewalk on the north side of N 117th St between Meridian Ave N and 1st Ave NE. This project is expected to be constructed as soon as mid-2021.

Existing Street Section

Typical Street Section - New Vertical Curbing and Natural Drainage System

Section Between Meridian and 1st

Looking East from Meridian Ave N

120th St Potential NDS Improvements

30% Design Plan - Adjustments may be made as design is finalized

Street Right Of Way Utilization Key

120th_replace_1.PNG
120th_replace_2.PNG

Meridian Ave N to Corliss Ave N

120th_replace_3.PNG
120th_replace_4.PNG

Corliss Ave N to 1st Ave NE

120th_replace_5.PNG
120th_replace_6.PNG

Existing Street Section

Typical Street Section - New Vertical Curbing Both Sides and Natural Drainage System

Section Between Meridian & Corliss

120th_replace_8.PNG

Existing Street Section

120th_replace_9.PNG

Typical Street Section - New Vertical Curbing Both Sides and Natural Drainage System

Section Between Corliss & 1st

Looking west