117th St Potential NDS Improvements

30% Design Plan - Adjustments may be made as design is finalized

SPU and SDOT are balancing on-street parking and pedestrian safety priorities while designing the 117th and 120th sites.

Street Right Of Way Utilization Key

Meridian Ave N to Corliss Ave N

Corliss Ave N to 1st Ave NE

To provide a comfortable and accessible walking connection to Northgate Elementary School, Seattle Department of Transportation (SDOT) is planning to construct a new asphalt sidewalk on the north side of N 117th St between Meridian Ave N and 1st Ave NE. This project is expected to be constructed as soon as mid-2021.

Existing Street Section

Typical Street Section - New Vertical Curbing and Natural Drainage System

Section Between Meridian and 1st

Looking East from Meridian Ave N

120th St Potential NDS Improvements

30% Design Plan - Adjustments may be made as design is finalized

Street Right Of Way Utilization Key

Meridian Ave N to Corliss Ave N

Corliss Ave N to 1st Ave NE

Existing Street Section

Typical Street Section - New Vertical Curbing Both Sides and Natural Drainage System

Section Between Meridian & Corliss

Existing Street Section

Typical Street Section - New Vertical Curbing Both Sides and Natural Drainage System

Section Between Corliss & 1st

Looking west